Table of Contents
Previous Page Next Page Table of Contents
     
Return to Previous Page

Section 1 - Jobsite Preparation and Equipment Staging

  • 1.1 Peelle Company Contact Information
  • 1.2 Introduction
  • 1.3 Unpacking/Reviewing Materials
  • 1.4 Tool List

Section 2 - Frame Installation

  • 2.1 Frame Criteria
  • 2.2 Installing the Sill
  • 2.3 Installing the Sill
  • 2.4 Installing the Sill
  • 2.5 Installing the Jambs (Side Members) and Head of Frame

Section 3 - Rail Installation

  • 3.1 Materials
  • 3.2 Rail Installation Summary
  • 3.3 Determine Best Horizontal Location for Rails on the Flange of the Vertical Jambs
  • 3.4 Identify Type of Rails Being Used
  • 3.5 Identify Vertical Sill Mark
  • 3.6 Verify Door Gauge Rod for Distance Between Guides (DBG) is correct length
  • 3.7 Install First Rail ("King Rail") [Interlock Side]
  • 3.8 Install Opposite Rail ("Queen Rail") [Side opposite the interlock]
  • 3.9 Install Second King Rail
  • 3.10 Mount Operators/ Sheaves
  • 3.11 Mount Door Rail Junction Boxes and DOFL Limit Switches

Section 4 - Door Hanging

  • 4.1 Door Installation Summary
  • 4.2 Hang Door Chains
  • 4.3 Secure Chain Fall at Top of Shaft
  • 4.4 Install Lower Door Panel
  • 4.5 Install Upper Door Panel
  • 4.6 Mount Tension Latches
  • 4.7 Attach Chains and Level Upper Door Panel
  • 4.8 Install Door Interlock
  • 4.9 Door Interlock Installation
  • 4.10 Tension Latch Adjustment
  • 4.11 Install Tamper Resistant Plugging Rod
  • 4.12 Adjust Contact Arm Cam
  • 4.13 Install Door Unlocking Device
  • 4.14 Install Anchors and/or Spreaders for each Pair of Rails
  • 4.15 Mount Limit Faceplate
 

Section 5 - Cab Enclosure

  • 5.1 Cab Enclosure Installation Summary
  • 5.2 Fasten Bottom Angles to Car Platform
  • 5.3 Assemble Right Side Wall of Cab Enclosure
  • 5.4 Assemble Back Wall of Cab Enclosure
  • 5.5 Assemble Left Side Wall of Cab Enclosure
  • 5.6 Attach Top Support Angles
  • 5.7 Assemble Top of Cab Enclosure
  • 5.8 Attach Stile Steadying Plate
  • 5.9 Plumb Cab Enclosure Walls
  • 5.10 Install Cab Lights, Bumpers, Fan
  • 5.11 Engage Emergency Exit Contact Switch

Section 6 - Gate Installation

  • 6.1 Car Gate Installation Summary
  • 6.2 Fasten Gate Rails to Cab Enclosure
  • 6.3 Install Cross Braces from Top Gate Spreader Angle to Gate Rails
  • 6.4 Install Cross Braces from Car Gate to Car Cross Head
  • 6.5 Install Counterweight
  • 6.6 Install Gate Operator
  • 6.7 Fasten Gate Chains
  • 6.8 Install Gate Panel(s)
  • 6.9 Install the Retiring Cam Assembly
  • 6.10 Install Limit Switches
  • 6.11 Set Door and Gate Limits
  • 6.12 Install Gate Contact
  • 6.13 Install Light Curtain
  • 6.14 Adjust Interlock Roller Arms to be Fully Depressed by Retiring Cam Face

Section 7 - Controller Installation

  • 7.1 Wiring Package (Optional)
  • 7.2 Controller & Wiring Installation Summary
  • 7.3 Mount Controller Enclosure in Elevator Machine Room
  • 7.4 Mount Center Junction Box in Hoistway
  • 7.5 Pipe Hoistway and Cab Enclosure
  • 7.6 Mount Top of Cab Junction Box
  • 7.7 Pull Peelle Bundle Wire Through Conduit
  • 7.8 Phase Door Motors
  • 7.9 Phase Retiring Cam Motor
  • 7.10 Phase Gate Motor
  • 7.11 Adjust Door Sensor Limits
  • 7.12 Adjust Gate Sensor Limits
  • 7.13 Check Interlocks for Continuity
  • 7.14 Check Gate Contact for Continuity
  • 7.15 Test Light Curtain/Reversing Edge
  • 7.16 Check for Door Automatic Stay Open (ASO) (Optional)
  • 7.17 Adjust GCT & ACT Timers
  • 7.18 Fasten All Covers
  • 7.19 Sequence of Operation
  • 7.20 Controller Features
         

Minnesota Elevator, Inc. Website Glossary | Manuals
© 2007 PEELLE All Rights Reserved.